Software Engineeing

Question 1
In a software project, COCOMO (Constructive Cost Model) is used to estimate
A
effort and duration based on the size of the software
B
size and duration based on the effort of the software
C
effort and cost based on the duration of the software
D
size, effort and duration based on the cost of the software
       Software Engineeing       SE       Gate 2004-IT
Question 1 Explanation: 
Note: Out of syllabus.
There is 1 question to complete.